Example Projects

Feasibility Study for Prishtina Wastewater Treatment Plant

Feasibility Study for Prishtina Wastewater Treatment Plant

Strategic planning and engineering for the feasibility study and preliminary design of Prishtina Wastewater Treatment Plant and sewer network (p.e. 400,000). Analysis of strategic development options and preparation of a long-term development plan for water and wastewater in the city of Prishtina for €160 million of infrastructure. Calculation of flow and loadings, least-cost analysis,selection of development options, preparation of technical documentation for WWTP and presentation of recommended wastewater treatment plant option.

» more details «

Kamza Water Supply Study

Kamza Water Supply Study

Assessment of potential design options for expansion of water production capacity at Tirana WTP by 600l/s for supply of water to Kamza. Economic analysis of options based on whole-life cost assessment followed by presentation of results to project stakeholders.

» more details «

Vranje Wastewater Development Feasibility Study

Wastewater engineering for WWTP and sewer network to provide development options, preliminary design and whole-life cost evaluation of wastewater solutions for the city of Vranje in southern Serbia (p.e. 115,000).

» more details «

Institutional Support to the Kosovo Water & Waste Regulator

Institutional Support to the Kosovo Water & Waste Regulator

Delivery of training, strategy, procedures and guidance document on ASSET MANAGEMENT PLANNING, primarily for use by the water regulator and regional water companies to assist with tariff determinations.

» more details «

» view all projects «